Program/Construction Management (PM/CM)

betmgm live dealer game This involved building a new terminal while refurbishing the existing one and undertaking airside (e.g., upgrading taxiways) and landside works. The project was divided into several phases to minimize disruptions to the ongoing airport operations. Parsons is responsible for overseeing all project stages – from initial planning and design to construction, testing and commissioning, and handover.

A Focus On Speed And Service

The Sharjah airport expansion betmgm live casinowill increase its capacity to accommodate up to 20 million passengers a year while improving the existing infrastructure to enhance the traveler experience.

The central project theme is focused on meeting a ‘20 minutes in, 20 minutes out’  timeframe for each passenger. This philosophy inspired our overall facilities design and development approach so passengers could safely and securely depart, transfer or go through arrivals within this time frame.

This philosophy inspired our overall facilities design and development approach so passengers could safely and securely depart, transfer or go through arrivals within this time frame. We also worked with the client to obtain an ‘Optimum’ Level of Service (LoS) in line with the International Air Transport Association (IATA) best practices.

In addition to conducting in-depth program studies and creating detailed technical and master plans, betmgm online live casinowe also worked with various stakeholders, such as the local authorities, government agencies, utility companies, and contractors, to drive efficient project delivery.

Managing A Brownfield Project

Since the land that Sharjah International Airport is built on was used previously and once commercially developed, the project was considered a brownfield project. In order to allow the construction of the new facilities, detailed demolition, relocation, and phasing had to be developed. In close engagement with stakeholders, a plan was prepared and executed to ensure minimum disruption to ongoing operations.

Incorporating Innovation And Technology

BetMGM login appFor this project, we used modern camera technology able to provide real-time insights and help keep track of progress efficiently in specific projects. As such we ensure effective monitoring and prompt decision-making for specific projects.

Project Scope And Services

  • Program management
  • Project management
  • Master plan validation
  • Value engineering (VE)
  • Design management
  • Design review
  • Contract administration
  • Project controls
  • Document and records management
  • Quality management
  • Claims management
  • Program master schedule controls
  • Sewage treatment plant (STP) schematic design
  • Road network design and supervision

450+ Projects in 40+ Countries

With a global team of 375+ aviation experts, we commit to collaborating with clients to develop solutions for even the toughest challenges. We have worked on over 450 airport projects in 40 betmgm online live casinocountries helping our clients design, develop, manage, enhance and sustain world-class facilities. Click here to learn more about our aviation expertise.