{"id":12470,"date":"2020-08-18T13:30:00","date_gmt":"2020-08-18T20:30:00","guid":{"rendered":"https:\/\/origin-www.parsons.com\/?p=12470"},"modified":"2020-08-20T07:18:34","modified_gmt":"2020-08-20T14:18:34","slug":"parsons-completes-requirements-for-operations-at-salt-waste-processing-facility","status":"publish","type":"post","link":"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/","title":{"rendered":"Parsons Completes Requirements for Operations at Salt Waste Processing Facility"},"content":{"rendered":"\n

CENTREVILLE, Va. (Aug. 18, 2020) \u2013 Parsons Corporation (NYSE: PSN) has completed all necessary steps to begin the treatment of radioactive waste at the Department of Energy\u2019s (DOE) Salt Waste Processing Facility (SWPF) in Aiken, SC. The purpose-built facility \u2013 from conceptual design to operations \u2013 is the first of its kind and will process the site\u2019s salt waste at seven to eight times the rate it is being processed today.<\/p>\n\n\n\n

\u201cThis historic milestone is only possible because of the strong partnership and commitment from the Department of Energy,\u201d said Chuck Harrington, chief executive officer of Parsons. \u201cThe innovations of SWPF will forever change how we remediate nuclear waste and ensure that a cleaner, more sustainable and environmentally sensitive world is possible for the future.\u201d<\/p>\n\n\n\n

In 2002, the DOE selected Parsons to design, build, commission and operate SWPF with the goal of processing 31\u202fmillion gallons of radioactive salt waste stored in underground tanks at the Savannah River Site (SRS). Removing salt waste, which fills over 90% of tank space in the SRS tank farms, is a major step toward emptying and closing the site\u2019s remaining 43 high-level waste tanks. Parsons finished building SWPF in April 2016, eight\u202fmonths ahead of schedule and more than $65\u202fmillion under the target cost of the contract for construction activities.<\/p>\n\n\n\n

\u201cThe startup of SWPF and the increased treatment capacity will save billions of dollars in overall operational costs by reducing the number of years needed to accomplish the nuclear remediation mission,\u201d said Chris Alexander, executive vice president and engineered systems market leader for Parsons. \u201cWhen operational, the SWPF will significantly increase processing rates over the existing interim system and speed the effort to empty the site\u2019s waste tanks. Its key mission is to separate and concentrate highly radioactive waste \u2014 mostly cesium, strontium, actinides and waste slurry \u2014 from the less-radioactive salt solution.\u201d<\/p>\n\n\n\n

After completing the initial separation process, the concentrated high-activity waste will be sent to the nearby Defense Waste Processing Facility where it will be immobilized in glass and stored in vaults until it can be placed in a geological repository. The decontaminated salt solution will be mixed with cement-like grout at the nearby Saltstone facility for disposal onsite.<\/p>\n\n\n\n

Parsons has supported the Department of Energy at the Savannah River Site for more than 30 years and has served as the prime SWPF contractor since 2002, with responsibility for design, development and commissioning as well as operating the facility for one year.<\/p>\n","protected":false},"excerpt":{"rendered":"

CENTREVILLE, Va. (Aug. 18, 2020) \u2013 Parsons Corporation (NYSE: PSN) has completed all necessary steps to begin the treatment of radioactive waste at the Department of Energy\u2019s (DOE) Salt Waste […]<\/p>\n","protected":false},"author":28,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-12470","post","type-post","status-publish","format-standard","hentry","category-press-release"],"yoast_head":"\nParsons Completes Requirements for Operations at Salt Waste Processing Facility<\/title>\n<meta name=\"description\" content=\"CENTREVILLE, Va. (Aug. 18, 2020) \u2013 Parsons Corporation (NYSE: PSN) has completed all necessary steps to begin the treatment of radioactive waste at the\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Parsons Completes Requirements for Operations at Salt Waste Processing Facility\" \/>\n<meta property=\"og:description\" content=\"CENTREVILLE, Va. (Aug. 18, 2020) \u2013 Parsons Corporation (NYSE: PSN) has completed all necessary steps to begin the treatment of radioactive waste at the\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/\" \/>\n<meta property=\"og:site_name\" content=\"Parsons Corporation\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/parsonscorporation\" \/>\n<meta property=\"article:published_time\" content=\"2020-08-18T20:30:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-08-20T14:18:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.parsons.com\/wp-content\/uploads\/2020\/02\/parsons-logo-for-social.png\" \/>\n\t<meta property=\"og:image:width\" content=\"684\" \/>\n\t<meta property=\"og:image:height\" content=\"353\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Bernadette Miller\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@parsonscorp\" \/>\n<meta name=\"twitter:site\" content=\"@parsonscorp\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Bernadette Miller\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/\"},\"author\":{\"name\":\"Bernadette Miller\",\"@id\":\"https:\/\/www.parsons.com\/#\/schema\/person\/f1be90b8df1166aa18dd6c1b59af2b13\"},\"headline\":\"Parsons Completes Requirements for Operations at Salt Waste Processing Facility\",\"datePublished\":\"2020-08-18T20:30:00+00:00\",\"dateModified\":\"2020-08-20T14:18:34+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/\"},\"wordCount\":410,\"publisher\":{\"@id\":\"https:\/\/www.parsons.com\/#organization\"},\"articleSection\":[\"Press Release\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/\",\"url\":\"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/\",\"name\":\"Parsons Completes Requirements for Operations at Salt Waste Processing Facility\",\"isPartOf\":{\"@id\":\"https:\/\/www.parsons.com\/#website\"},\"datePublished\":\"2020-08-18T20:30:00+00:00\",\"dateModified\":\"2020-08-20T14:18:34+00:00\",\"description\":\"CENTREVILLE, Va. (Aug. 18, 2020) \u2013 Parsons Corporation (NYSE: PSN) has completed all necessary steps to begin the treatment of radioactive waste at the\",\"breadcrumb\":{\"@id\":\"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.parsons.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Parsons Completes Requirements for Operations at Salt Waste Processing Facility\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.parsons.com\/#website\",\"url\":\"https:\/\/www.parsons.com\/\",\"name\":\"Parsons Corporation\",\"description\":\"Infrastructure, Defense, Security, and Construction\",\"publisher\":{\"@id\":\"https:\/\/www.parsons.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.parsons.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.parsons.com\/#organization\",\"name\":\"Parsons Corporation\",\"url\":\"https:\/\/www.parsons.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.parsons.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.parsons.com\/wp-content\/uploads\/2020\/02\/parsons-logo-for-social.png\",\"contentUrl\":\"https:\/\/www.parsons.com\/wp-content\/uploads\/2020\/02\/parsons-logo-for-social.png\",\"width\":684,\"height\":353,\"caption\":\"Parsons Corporation\"},\"image\":{\"@id\":\"https:\/\/www.parsons.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/parsonscorporation\",\"https:\/\/x.com\/parsonscorp\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.parsons.com\/#\/schema\/person\/f1be90b8df1166aa18dd6c1b59af2b13\",\"name\":\"Bernadette Miller\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.parsons.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/3aab7d6bacaebb3710df7bce20e9ed8a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/3aab7d6bacaebb3710df7bce20e9ed8a?s=96&d=mm&r=g\",\"caption\":\"Bernadette Miller\"},\"url\":\"https:\/\/www.parsons.com\/author\/bernadette-miller\/\"}]}<\/script>\n","yoast_head_json":{"title":"Parsons Completes Requirements for Operations at Salt Waste Processing Facility","description":"CENTREVILLE, Va. (Aug. 18, 2020) \u2013 Parsons Corporation (NYSE: PSN) has completed all necessary steps to begin the treatment of radioactive waste at the","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/","og_locale":"en_US","og_type":"article","og_title":"Parsons Completes Requirements for Operations at Salt Waste Processing Facility","og_description":"CENTREVILLE, Va. (Aug. 18, 2020) \u2013 Parsons Corporation (NYSE: PSN) has completed all necessary steps to begin the treatment of radioactive waste at the","og_url":"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/","og_site_name":"Parsons Corporation","article_publisher":"https:\/\/www.facebook.com\/parsonscorporation","article_published_time":"2020-08-18T20:30:00+00:00","article_modified_time":"2020-08-20T14:18:34+00:00","og_image":[{"width":684,"height":353,"url":"https:\/\/www.parsons.com\/wp-content\/uploads\/2020\/02\/parsons-logo-for-social.png","type":"image\/png"}],"author":"Bernadette Miller","twitter_card":"summary_large_image","twitter_creator":"@parsonscorp","twitter_site":"@parsonscorp","twitter_misc":{"Written by":"Bernadette Miller","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/#article","isPartOf":{"@id":"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/"},"author":{"name":"Bernadette Miller","@id":"https:\/\/www.parsons.com\/#\/schema\/person\/f1be90b8df1166aa18dd6c1b59af2b13"},"headline":"Parsons Completes Requirements for Operations at Salt Waste Processing Facility","datePublished":"2020-08-18T20:30:00+00:00","dateModified":"2020-08-20T14:18:34+00:00","mainEntityOfPage":{"@id":"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/"},"wordCount":410,"publisher":{"@id":"https:\/\/www.parsons.com\/#organization"},"articleSection":["Press Release"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/","url":"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/","name":"Parsons Completes Requirements for Operations at Salt Waste Processing Facility","isPartOf":{"@id":"https:\/\/www.parsons.com\/#website"},"datePublished":"2020-08-18T20:30:00+00:00","dateModified":"2020-08-20T14:18:34+00:00","description":"CENTREVILLE, Va. (Aug. 18, 2020) \u2013 Parsons Corporation (NYSE: PSN) has completed all necessary steps to begin the treatment of radioactive waste at the","breadcrumb":{"@id":"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.parsons.com\/2020\/08\/parsons-completes-requirements-for-operations-at-salt-waste-processing-facility\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.parsons.com\/"},{"@type":"ListItem","position":2,"name":"Parsons Completes Requirements for Operations at Salt Waste Processing Facility"}]},{"@type":"WebSite","@id":"https:\/\/www.parsons.com\/#website","url":"https:\/\/www.parsons.com\/","name":"Parsons Corporation","description":"Infrastructure, Defense, Security, and Construction","publisher":{"@id":"https:\/\/www.parsons.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.parsons.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.parsons.com\/#organization","name":"Parsons Corporation","url":"https:\/\/www.parsons.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.parsons.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.parsons.com\/wp-content\/uploads\/2020\/02\/parsons-logo-for-social.png","contentUrl":"https:\/\/www.parsons.com\/wp-content\/uploads\/2020\/02\/parsons-logo-for-social.png","width":684,"height":353,"caption":"Parsons Corporation"},"image":{"@id":"https:\/\/www.parsons.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/parsonscorporation","https:\/\/x.com\/parsonscorp"]},{"@type":"Person","@id":"https:\/\/www.parsons.com\/#\/schema\/person\/f1be90b8df1166aa18dd6c1b59af2b13","name":"Bernadette Miller","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.parsons.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/3aab7d6bacaebb3710df7bce20e9ed8a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3aab7d6bacaebb3710df7bce20e9ed8a?s=96&d=mm&r=g","caption":"Bernadette Miller"},"url":"https:\/\/www.parsons.com\/author\/bernadette-miller\/"}]}},"_links":{"self":[{"href":"https:\/\/www.parsons.com\/wp-json\/wp\/v2\/posts\/12470"}],"collection":[{"href":"https:\/\/www.parsons.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.parsons.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.parsons.com\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.parsons.com\/wp-json\/wp\/v2\/comments?post=12470"}],"version-history":[{"count":0,"href":"https:\/\/www.parsons.com\/wp-json\/wp\/v2\/posts\/12470\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.parsons.com\/wp-json\/wp\/v2\/media?parent=12470"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.parsons.com\/wp-json\/wp\/v2\/categories?post=12470"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.parsons.com\/wp-json\/wp\/v2\/tags?post=12470"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}